As traditional infrastructure design methods migrate from 2D to 3D modeling, this presentation aims to show a collaborative process integrating geospatial operations across downstream transportation design processes to deliver Digital As-Built/Digital Twins deliverables at minimum cost and maximum quality where and when they are needed.